Power Construction Gallery

The project, which created Berried Tank Dyke Wall, HSD Tank Foundation, Fire Water Tank Foundation, Product Pump House, Fire Water Pump House, Gantry, Weighbridge, L.T. Room, Generator Room, Office Building, Flooring, Boundary Wall and etc

 

The Construction of 8 No. Horizontal and 2 No. Vertical Chemical Storage tanks and the piping of these tanks.

  • Tanks = Fabrication & Erection.
  • Piping = Fabrication & Erection.
  • All works as per drawing and PQR, WPS, ITP standards applied.
  • NDT test, RT, DPT, all joints tested by (DPT) Dye Penetrant.
  • RT applied per tank 30%.